Project Overview
The Bagram to Jabal al-Siraj Road Construction Project is a major national infrastructure development aimed at improving regional connectivity, transportation efficiency, and economic growth.
This road construction contract was originally awarded by the Ministry of Public Works under Contract No. NPA/MOPW/97/W-2137/NCB to a Joint Venture (JV) between Harirod Construction Company and Email You Company prior to the change in government administration.
Following a temporary suspension, the contract has now been officially reactivated to complete the remaining works of the project. The updated contract duration for completion of the outstanding activities is 12 calendar months.
Project Location
-
Starting Point: Bagram Junction
-
Ending Point: Jabal al-Siraj
-
Total Length: 25.600 Kilometers
The project corridor plays a vital role in strengthening transportation infrastructure and facilitating smoother movement of goods and passengers within the region.
Scope of Work
The project includes the completion of remaining construction activities necessary to fully operationalize the roadway in accordance with national road construction standards.
Key Components:
-
Earthworks and roadbed preparation
-
Sub-base and base course construction
-
Asphalt paving works
-
Drainage system installation
-
Road safety structures
-
Culverts and cross-drainage works
-
Road signage and markings
-
Shoulder construction and finishing works
All works are being executed in compliance with engineering specifications and quality standards set by the Ministry of Public Works.
Contract Details
-
Contract Number: NPA/MOPW/97/W-2137/NCB
-
Contracting Authority: Ministry of Public Works
-
Contractor: Joint Venture of Harirod Construction Company & Email You Company
-
Project Duration (Revised): 12 Calendar Months
-
Project Status: Reactivated – Ongoing Completion Phase
Project Importance
The Bagram to Jabal al-Siraj road is considered a strategic infrastructure project due to its role in:
-
Enhancing regional transportation connectivity
-
Reducing travel time
-
Improving road safety standards
-
Supporting trade and local businesses
-
Facilitating economic development
-
Strengthening public infrastructure
Completion of this project will significantly improve accessibility and mobility for communities along the route.
Current Implementation Phase
Following the reactivation of the contract, mobilization of technical teams, equipment, and resources has been completed. Construction activities are currently focused on:
-
Completing unfinished civil works
-
Asphalt pavement layers
-
Drainage and structural components
-
Road safety installations
The project team is committed to completing all remaining quantities within the 12-month contractual timeframe.
Quality Assurance & Safety
Harirod Construction Company maintains strict adherence to:
-
National road construction standards
-
Quality control and material testing procedures
-
Environmental protection measures
-
Occupational health and safety regulations
Regular site supervision and engineering inspections ensure that all works meet approved technical specifications.
Commitment to Infrastructure Development
Harirod Construction Company continues to play a key role in delivering large-scale infrastructure and road construction projects across the region. The successful completion of the Bagram Junction to Jabal al-Siraj Road Project will further strengthen our reputation as a reliable and professional construction partner.
Contact Us
For more information about this project or our infrastructure services, please contact:
Harirod Construction Company
Building Sustainable Infrastructure for a Stronger Future.