Project Progress Update March 2026

FMIC 1MW On-Grid Solar Power System

Project Progress Update

FMIC 1MW On-Grid Solar Power System – Project Progress Update

Harirod Construction Company is proud to announce significant progress on the FMIC 1MW On-Grid Solar Power System Project, a major renewable energy development designed to deliver clean, reliable, and sustainable electricity to the national grid.

As a leading construction and engineering company specializing in infrastructure and renewable energy projects, Harirod Construction Company continues to expand its footprint in large-scale solar power system development.

About the FMIC 1MW On-Grid Solar Power Project

The FMIC 1MW On-Grid Solar Power System is a grid-connected photovoltaic (PV) solar energy project with a generation capacity of 1 megawatt (MW). The system is engineered to:

  • Produce clean, renewable solar energy
  • Reduce dependence on fossil fuels
  • Lower carbon emissions
  • Improve long-term energy sustainability
  • Strengthen national power infrastructure

This utility-scale solar power plant is designed using high-efficiency solar panels, advanced inverters, and optimized mounting systems to ensure maximum performance and durability.

Project Scope of Work

Harirod Construction Company is delivering full Engineering, Procurement, Construction, and Commissioning (EPCC) services for the FMIC 1MW solar project, including:

  • Site analysis and technical feasibility study
  • Civil works and foundation construction
  • Solar mounting structure installation
  • Solar panel installation and alignment
  • DC and AC electrical cabling
  • Inverter installation and configuration
  • Grid interconnection and synchronization
  • System testing and commissioning

Current Project Progress Status

We are pleased to report that the FMIC 1MW On-Grid Solar Power System project is progressing according to schedule.

Completed Milestones

  • Site survey and geotechnical investigation
  • Detailed engineering design and layout approval
  • Procurement and delivery of solar panels and inverters
  • Civil foundation and structural works
  • Installation of mounting structures

Ongoing Activities

  • Installation of photovoltaic (PV) modules
  • Inverter room setup and electrical works
  • DC/AC cabling and combiner box installation
  • Earthing and lightning protection systems
  • Grid connection preparation

Our technical team is working diligently to ensure high-quality installation while maintaining strict adherence to project timelines.

Quality Assurance & Safety Standards

At Harirod Construction Company, we prioritize:

  • International solar power installation standards
  • Electrical safety compliance
  • Environmental protection regulations
  • Strict quality control procedures

Routine inspections, safety briefings, and quality audits are conducted to ensure the project meets both national and international renewable energy standards.

Environmental & Economic Impact

Upon completion, the FMIC 1MW Solar Power Plant will:

  • Significantly reduce annual CO₂ emissions
  • Provide sustainable clean energy to the grid
  • Support green energy development
  • Contribute to long-term economic growth
  • Create local employment opportunities

This project reinforces our commitment to building sustainable infrastructure and advancing renewable energy solutions.

Upcoming Project Milestones

The next stages of the FMIC Solar Power System include:

  • Completion of solar panel installation
  • Electrical integration and system testing
  • Grid synchronization
  • Final performance evaluation
  • Project commissioning and handover

We remain confident that the project will be delivered on time and will operate at optimal efficiency.

Leading Solar Power Construction Company

Harirod Construction Company continues to position itself as a trusted leader in:

  • Solar power plant construction
  • Renewable energy engineering
  • On-grid solar system installation
  • Infrastructure development projects

The FMIC 1MW On-Grid Solar Power System is a key milestone in our growing renewable energy portfolio.

Contact Harirod Construction Company

For more information about our solar power projects, renewable energy services, and infrastructure solutions, please contact Harirod Construction Company today.

Harirod Construction Company – Building Sustainable Infrastructure. Powering the Future with Clean Energy.

Project Info

Project Overview

The Bagram  to Jabal al-Siraj Road Construction Project is a major national infrastructure development aimed at improving regional connectivity, transportation efficiency, and economic growth.

This road construction contract was originally awarded by the Ministry of Public Works under Contract No. NPA/MOPW/97/W-2137/NCB to a Joint Venture (JV) between Harirod Construction Company and Himmel-u Papisch prior to the change in government administration.

Following a temporary suspension, the project has now been officially recontracted to complete the remaining works. The updated contract duration for completion of the outstanding activities is 12 calendar months.

You May Also Know How it Uses In IT Field?

Project Overview

The Bagram to Jabal al-Siraj Road Construction Project is a major national infrastructure development aimed at improving regional connectivity, transportation efficiency, and economic growth.

This road construction contract was originally awarded by the Ministry of Public Works under Contract No. NPA/MOPW/97/W-2137/NCB to a Joint Venture (JV) between Harirod Construction Company and Email You Company prior to the change in government administration.

Following a temporary suspension, the contract has now been officially reactivated to complete the remaining works of the project. The updated contract duration for completion of the outstanding activities is 12 calendar months.

Project Location

  • Starting Point: Bagram Junction

  • Ending Point: Jabal al-Siraj

  • Total Length: 25.600 Kilometers

The project corridor plays a vital role in strengthening transportation infrastructure and facilitating smoother movement of goods and passengers within the region.

Scope of Work

The project includes the completion of remaining construction activities necessary to fully operationalize the roadway in accordance with national road construction standards.

Key Components:

  • Earthworks and roadbed preparation

  • Sub-base and base course construction

  • Asphalt paving works

  • Drainage system installation

  • Road safety structures

  • Culverts and cross-drainage works

  • Road signage and markings

  • Shoulder construction and finishing works

All works are being executed in compliance with engineering specifications and quality standards set by the Ministry of Public Works.

Contract Details

  • Contract Number: NPA/MOPW/97/W-2137/NCB

  • Contracting Authority: Ministry of Public Works

  • Contractor: Joint Venture of Harirod Construction Company & Email You Company

  • Project Duration (Revised): 12 Calendar Months

  • Project Status: Reactivated – Ongoing Completion Phase

Project Importance

The Bagram to Jabal al-Siraj road is considered a strategic infrastructure project due to its role in:

  • Enhancing regional transportation connectivity

  • Reducing travel time

  • Improving road safety standards

  • Supporting trade and local businesses

  • Facilitating economic development

  • Strengthening public infrastructure

Completion of this project will significantly improve accessibility and mobility for communities along the route.

Current Implementation Phase

Following the reactivation of the contract, mobilization of technical teams, equipment, and resources has been completed. Construction activities are currently focused on:

  • Completing unfinished civil works

  • Asphalt pavement layers

  • Drainage and structural components

  • Road safety installations

The project team is committed to completing all remaining quantities within the 12-month contractual timeframe.

Quality Assurance & Safety

Harirod Construction Company maintains strict adherence to:

  • National road construction standards

  • Quality control and material testing procedures

  • Environmental protection measures

  • Occupational health and safety regulations

Regular site supervision and engineering inspections ensure that all works meet approved technical specifications.

Commitment to Infrastructure Development

Harirod Construction Company continues to play a key role in delivering large-scale infrastructure and road construction projects across the region. The successful completion of the Bagram Junction to Jabal al-Siraj Road Project will further strengthen our reputation as a reliable and professional construction partner.

Contact Us

For more information about this project or our infrastructure services, please contact:

Harirod Construction Company
Building Sustainable Infrastructure for a Stronger Future.

Ongoing Projects, Road Construction

Project Info

Facilities Maintenance Service

Since its inception, the Maintenance Services Division of Harirod Group of Companies has been committed to delivering reliable, high-quality facility management and maintenance services in Afghanistan. Our skilled workforce, technical expertise, and customer-oriented approach have established us as a trusted partner for government institutions, airports, and private sector facilities. With years of hands-on experience managing critical infrastructure, we ensure operational efficiency, safety, and long-term asset sustainability.

Key Projects

1. Kabul International Airport Maintenance Services (2009 – Present)

Harirod Group has proudly managed and delivered comprehensive airport maintenance and facility management services at Kabul International Airport since 2009. This long-standing engagement demonstrates our reliability, professionalism, and capacity to maintain mission-critical aviation infrastructure. Our services at the airport include:

  • Electrical and mechanical system maintenance

  • HVAC system management and servicing

  • Plumbing and sanitary system upkeep

  • Runway lighting and airfield infrastructure maintenance

  • Preventive and emergency maintenance protocols

  • Janitorial and general facility upkeep

  • 24/7 on-call technical support team

2. Presidential Palace Building Maintenance (2018 – 2021)

From 2018 to 2021, Harirod Group was entrusted with the Presidential Palace Building Maintenance Project, one of the most prestigious and high-security facilities in Afghanistan. We delivered full-spectrum MEP maintenance and facility support services, ensuring seamless operations and high performance across the complex. Services provided included:

  • High-security zone MEP (Mechanical, Electrical, and Plumbing) maintenance

  • Landscape maintenance and exterior beautification

  • Energy-efficient lighting and equipment upgrades

  • Routine inspections and technical reporting

  • Emergency repairs and infrastructure resilience support

What We Offer

Harirod’s Maintenance Services Division provides:

  • Comprehensive Facilities Management: Tailored solutions for government, corporate, and institutional facilities

  • Preventive & Corrective Maintenance: Scheduled inspections, system diagnostics, and rapid-response repairs

  • Specialized Technical Services: MEP systems, HVAC systems, electrical infrastructure, and fire safety systems

  • Soft Services: Janitorial services, landscaping, pest control, and waste management

  • Project-Based and Long-Term Contracts: Flexible service models tailored to client operational requirements

Hard Services

Hard FM (Facility Management)
Electrical System
Mechanical and Plumbing Systems
Ventilation and Air Conditioning Systems
Civil and Building Fabric Works
Carpentry, Painting and Masonry Works
LV/MV System
Lighting Control System
Audio/Visual & PA System
Maintenance of Infrastructure
Asset Management
Health and Safety System (IMS)

Soft Services

Internal and External Cleaning
Façade and Glass Cleaning
Hygiene Cleaning
Gardening and Landscaping
Trolley Management
Staffing Services
General Administration
Industrial Facilities Cleaning

Project Impacts

Through these projects, Harirod Group has significantly contributed to maintaining the reliability, safety, and operational efficiency of some of Afghanistan’s most important national facilities. Our long-term maintenance services have helped extend infrastructure lifespan, reduce operational disruptions, and improve facility performance through proactive maintenance strategies. By supporting critical sites such as Kabul International Airport and the Presidential Palace, Harirod continues to play a vital role in strengthening Afghanistan’s infrastructure sustainability and facility management standards.

Maintenance Service, Ongoing Projects

Project Info

Project Overview:

HARIROD Group of Companies is excited to announce our newly signed project agreement with FMIC (French Medical Institute for Children) for the installation of a 1MW On-Grid Solar Power System. This landmark project aligns with our commitment to promoting sustainable energy solutions and contributing to Afghanistan’s energy independence. As a reliable partner in renewable energy, HARIROD will take on the full design, supply, installation, and commissioning of the system, ensuring that the FMIC hospital, a vital healthcare facility, benefits from a consistent and environmentally-friendly power source.

Project Scope and Objectives:
This project involves the installation of a 1MW solar power system, designed to integrate seamlessly with the national grid, providing clean and cost-effective electricity to FMIC’s operations. The main objectives of this initiative are:

  • Energy Efficiency & Sustainability: The installation of solar panels will significantly reduce the hospital’s reliance on traditional electricity sources, helping them lower their carbon footprint while ensuring an uninterrupted power supply.

  • Cost Reduction: The solar power system will lower the operational costs for FMIC by providing an alternative and cheaper source of energy, which is especially critical for a healthcare facility operating around the clock.

  • Reliability: With Afghanistan’s power grid often being unstable, this on-grid system will act as a vital backup, ensuring a steady and reliable energy supply for the hospital’s critical operations.

Project Components:

  1. Solar Panel Installation: High-efficiency solar panels will be strategically installed across the hospital’s rooftop and other available areas to maximize energy generation.

  2. Inverters & Transformers: State-of-the-art inverters and transformers will be used to convert the solar power into usable electricity and integrate it with the national grid, ensuring optimal energy flow and stability.

  3. Monitoring and Control System: An advanced monitoring system will be installed to track the system’s performance, ensuring maximum efficiency and enabling real-time troubleshooting and maintenance.

  4. Connection to National Grid: The system will be fully connected to the national grid, enabling FMIC to contribute any excess power back to the grid, in line with Afghanistan’s renewable energy regulations.

Project Impact:

  • Improved Access to Healthcare: By providing reliable and sustainable power, the project will enhance the operational efficiency of FMIC, which is one of Afghanistan’s leading healthcare providers, ensuring continuous and high-quality medical services to children in need.

  • Support to National Sustainability Goals: This project is part of HARIROD’s ongoing commitment to sustainable development, helping to reduce Afghanistan’s dependence on fossil fuels and contributing to a cleaner, greener energy future for the country.

  • Long-Term Energy Security: The on-grid solar system will provide FMIC with a long-term solution for energy security, reducing the risks associated with power outages and increasing operational reliability.

Timeline and Milestones: The project is expected to be completed in phases over the next 7 months, with the following milestones:

  • Phase 1: Site assessment, final design, and procurement (Done)

  • Phase 2: Installation of solar panels and system components (Done)

  • Phase 3: System testing, integration with the grid, and commissioning (In progress)

  • Phase 4: Final handover and project completion (To be done)

Why Choose HARIROD?
With years of experience in the construction, engineering, and renewable energy sectors, HARIROD Group of Companies is a trusted partner for large-scale, sustainable energy projects. Our team of experts brings the knowledge, experience, and technical expertise necessary to execute complex projects, ensuring efficiency, reliability, and long-term success. We are proud to support FMIC in their mission to provide world-class healthcare while also advancing Afghanistan’s energy sustainability goals.

Ongoing Projects, Solar Projects

Leave a Reply

Your email address will not be published.

You may use these <abbr title="HyperText Markup Language">HTML</abbr> tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*