Construction of Terminal Building (ETM) Apron and Parking of Khost Province Airfield

  • Client: Afghanistan Civil Aviation Authority (ACAA)
  • Funded By: Afghan Government
  • Location: Khost Province
  • Year: 04-Mar-2019 to 03-Mar-2021
  • Contract #: NPA/ACAA/97/W-2093/NCB

Scope of Work:

The project is an airport project located at Khost Province. The project is consist of: construction of new passenger terminal building, construction of control tower building, construction of approximately 79650 m² Apron made of standard quality concrete with all infrastructures and a Ground Service Equipment Road, Construction of asphalt Taxiway connecting the new apron to the runway, Construction of asphalt car parking approximately 8400m², Concrete for side walkway pavement 1000m² including Earth Work (Cutting and Filling), Reinforcement Work, Drainage, Reinforcement Concrete Box Culvert, Storm water system, Marking, and Joints saw cutting, cleaning and filling.