Maintenance and Upkeeping of Palace Villa Compound Extention-4

Scope of Works: The Scope of the work is consist of : • Up keeping and maintenance of the main building, cleaning, up keeping of the mechanical system such as water supply, sewer system, heating system, cooling system, electrical system and insuring of all functionality of the building for proper use by the client on […]

Procurement of Maintenance Services for Hamid Karzai International Airport (HKIA)

Scope of Works: Complete up keeping of the terminal building areas, operational areas and operations & preventive/breakdown maintenance of all installations/equipment in / out side the terminal building and operational areas as detailed in the bidding documents including day to day operations & maintenance of all civil, electrical, mechanical, electronic, communication, IT Equipment etc. to […]

Construction of the Multi Trade Institute (MTI) in Badakhshan

Scope of Works: The project comprises 4 major buildings: Administration Building: (46m*17.5m=805m2) Two story building Classroom-1: (35m*17.5m=612.5m2) Two story building Classroom-2: (35m*17.5m=612.5m2) Two story building Mal dormitory: (44m*14.5m=638 m2) Three story building Female toilet: (12m*7.1m=85 m2) One story building Male Toilet: (12m*7.1m=85 m2) One story building Workshop Mechanic: (35m*13m=455m2) Two story building Workshop Automotive:(24m*12m=288 m2) […]

Construction of the Multi Trade School (MTS) in Panjshir

Scope of Works: The MTS will be erected in Khenj District in the upper Panshjir Valley, at an altitude of appr. 2.200 m above sea-level on a plateau 8 m above the Panshjir River, not effected by floods. The project comprises 2 major buildings: – Construction of 2-floor building for administration in floor 1 and […]

Construction of the Multi Trade Institute (MTI) in Samangan

Scope of Works: The project comprises 3 major buildings: – Construction of 2-floor building for administration in floor 1 and laboratories and workshops in floor 2 – Construction of a 3-floor building with 28 class-rooms in floor 1–3 and a multipurpose room in floor 3 The construction of several 1-floor facility buildings: – Automotive Workshop […]

Construction of Terminal Building (ETM) Apron and Parking of Khost Province Airfield

Scope of Work: The project is an airport project located at Khost Province. The project is consist of: construction of new passenger terminal building, construction of control tower building, construction of approximately 79650 m² Apron made of standard quality concrete with all infrastructures and a Ground Service Equipment Road, Construction of asphalt Taxiway connecting the […]

Construction of 25+600 KM 2nd Line Road Project from Bagram to Jabal Siraj-Parwan

Scope of Work: The project Construction of 25+600 KM 2nd Line Road Project  from Bagram to Jabal Siraj Parwan Afghanistan is awarded by the Ministry of Public works through the open competitive bidding process of the NPA National Procurement Authority  to Harirod Construction Company, Kabul Afghanistan. The work started on this project with full swing […]