Project Location : Ministry of Defense, Kabul Afghanistan.
Project Info
Construction of MOD Headquarters at Kabul
Location: Kabul, Afghanistan Client: ITSI (Prime Contractor) Project Type: Government / Defense Infrastructure Scope: Subcontracted Construction Services
Project Description:
As a key subcontractor under the prime contractor ITSI, our team played a vital role in the Construction of the Ministry of Defense (MOD) Headquarters in Kabul, a major infrastructure project of national significance. Our scope of work encompassed several critical structural and architectural elements, ensuring the facility met high standards of durability, functionality, and design.
Subcontracted Work Orders Executed:
Structural Works: Comprehensive structural construction services including foundation preparation, concrete work, and framing, supporting the core integrity of the headquarters.
Terrazzo Flooring: Installation of high-quality terrazzo flooring, providing both durability and aesthetic appeal across key interior spaces.
Dry Wall Installation: Execution of drywall systems for interior partitioning and ceiling finishes, ensuring sound insulation and smooth surface finishing.
Deck System: Design and construction of robust deck systems to support elevated areas and ensure safe load distribution throughout the building.
WWTP Slab & Water Tank: Construction of the wastewater treatment plant (WWTP) slab and installation of an integrated water tank, supporting the site’s sustainability and infrastructure needs.
Auditorium Trusses: Fabrication and erection of large-span trusses for the auditorium, enabling wide-open spaces suitable for official gatherings and conferences.
Roof Top Waterproofing: Application of advanced waterproofing systems on the rooftop to prevent leakage, extend the roof’s lifespan, and enhance the building’s resilience to weather conditions.
Our contributions to this project underscore our capacity to deliver high-quality construction services in complex, high-security environments. The MOD Headquarters stands as a landmark achievement, and we are proud to have supported its successful execution.
Challenges & Performance
Operating in a high-security zone with rigorous compliance and quality demands, the project required:
Highly trained technical staff with security clearance
Continuous coordination with international and U.S. government entities
Timely adaptation to project scope changes, logistical delays, and environmental constraints
Harirod successfully fulfilled all subcontracted obligations with professionalism, precision, and full adherence to ITSI and U.S. Army Corps of Engineers (USACE) standards. Our strong coordination capabilities and efficient resource management contributed to the overall success of the MoD HQ construction.
Significance & Legacy
The Ministry of Defense Headquarters stands today as a key symbol of Afghanistan’s national defense capabilities. Harirod Group is proud to have contributed to this nation-building project, which supports command functions, strategic planning, and coordination of Afghan military operations nationwide.
This project further solidified Harirod’s reputation as a trusted and capable local partner for international contractors working in Afghanistan’s defense and infrastructure sectors.
Work Progress Clips
This video showcases the ongoing progress in shuttering and rebar bending activities at the MOD Headquarters construction site in Kabul. It highlights the precision and coordination of our skilled workforce as they execute critical phases of structural work. From formwork setup to meticulous steel reinforcement bending and placement, the footage reflects our commitment to quality, safety, and adherence to engineering standards.