The Project for Rehabilitation and Expansion of Aircraft Parking Aprons KIA (Phase 2)

Client: Afghanistan Civil Aviation Authority (ACAA)
Funded By: JICA-Japan
Contractor: Tsuchiya Corporation Japan
Year: 2014-2015

Scope of Work:

The project was approximately 29000 m2 of Air Craft Parking Apron made of reinforcement concrete with all infrastructures and a Ground Service Equipment Road with Asphalt Pavement surface. Major activity and scope of work in this Project consist of:
Earth Work (Cutting and Filling), Reinforcement Work, Concrete Pavement, Asphalt Pavement, Drainage, Reinforcement Concrete Box Culvert, Storm water system, Marking, and Joints saw cutting, cleaning and filling.